Renewable Energy Project Case Studies

Hydro  projects

Glenample Hydro Scheme

Glenample Hydro Scheme

Green Cat Contracting were appointed as Principal Contractor for the BoP works on the Glenample Hydro Power scheme. Works included the access tracks and drainage, intake structures, 1.7km of buried pipeline, powerhouse, tailrace, and cable trenching; all to the strict protocol of the Trossachs National Park Authority.

Tulchan of Glenisla Hydro Scheme

Tulchan of Glenisla Hydro Scheme

Green Cat Contracting were appointed as Principal Contractor for the BoP works on the Tulchan of Glenisla Hydro Power scheme. Works included the access tracks and drainage, intake structure, pipeline, powerhouse, tailrace and associated cable trenching, all to the strict protocol of the Cairngorms National Park Authorit

Onshore wind  projects

Pogbie Wind Farm

Pogbie Wind Farm

Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 12no Enercon E53 turbines on a design and build basis, including associated drainage, roads, hardstanding’s, cabling, sub station works and electrical infrastructure.

Welton of Creuchies

Welton of Creuchies

Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E82 turbines on a design and build basis, including associated drainage, roads, hardstanding’s, cabling, sub station works and electrical infrastructure.

Deuchries Wind Farm

Deuchries Wind Farm

Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Enercon E82 turbines near Aberchirder, Aberdeenshire on a design and build basis, a project that had previously been deemed unviable by its’ former owner.

Hendy Wind Farm

Hendy Wind Farm

Green Cat Contracting were employed as Principal Contractor on a design and build basis to provide 7no Vestas V80 turbines plus associated roads, drainage, and electrical infrastructure; sufficient produce a 17.5MW wind farm.