Renewable Energy Project Case Studies
Hydro projects
Glenample Hydro Scheme
Green Cat Contracting were appointed as Principal Contractor for the BoP works on the Glenample Hydro Power scheme. Works included the access tracks and drainage, intake structures, 1.7km of buried pipeline, powerhouse, tailrace, and cable trenching; all to the strict protocol of the Trossachs National Park Authority.
Tulchan of Glenisla Hydro Scheme
Green Cat Contracting were appointed as Principal Contractor for the BoP works on the Tulchan of Glenisla Hydro Power scheme. Works included the access tracks and drainage, intake structure, pipeline, powerhouse, tailrace and associated cable trenching, all to the strict protocol of the Cairngorms National Park Authorit
Fair-a-Far Weir Repairs and Fish Pass Installation
Employing our experience working in live river systems developed on our hydro power projects, Green Cat Contracting were appointed as Principal Contractor for the demolition and rebuilding of a river fish pass and weir restoration and repair works in the River Almond by Edinburgh City Council.
Onshore wind projects
Pogbie Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 12no Enercon E53 turbines on a design and build basis, including associated drainage, roads, hardstanding’s, cabling, sub station works and electrical infrastructure.
Welton of Creuchies
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E82 turbines on a design and build basis, including associated drainage, roads, hardstanding’s, cabling, sub station works and electrical infrastructure.
Hoprigshiels Wind Cluster
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Nordex N90 turbines on a design and build basis, including associated drainage, roads, hardstanding’s, cabling, sub station works and electrical infrastructure.
Deuchries Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Enercon E82 turbines near Aberchirder, Aberdeenshire on a design and build basis, a project that had previously been deemed unviable by its’ former owner.
Binn EcoPark Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E92 turbines at the Binn EcoPark near Glenfarg, Perthshire.
Rush Wall Wind Turbine
As specialists in the construction of onshore wind turbines, Green Cat Contracting were appointed to act as Principal Contractor and provide the access and foundation works for a Vensys 136 3.5MW turbine, measuring 150m to blade tip.
Hendy Wind Farm
Green Cat Contracting were employed as Principal Contractor on a design and build basis to provide 7no Vestas V80 turbines plus associated roads, drainage, and electrical infrastructure; sufficient produce a 17.5MW wind farm.