Key Info
-
Extensive cut/fill
-
On site borrowing to minimise imported aggregate
-
Off site cabling and connection works
Description
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Enercon E82 turbines near Aberchirder, Aberdeenshire on a design and build basis, a project that had previously been deemed unviable by its’ former owner.
Due to the existing topography of the site, an extensive programme of earthworks was required. Due to the weak and variable nature of the existing soils however, two borrow pits were required to facilitate the works.
As well as the onsite electrical infrastructure and substation works, Green Cat Contracting facilitated over 1.5km of new cable installation offsite to connect the development to the existing DNO overhead line.
More onshore wind projects
Hendy Wind Farm
Green Cat Contracting were employed as Principal Contractor on a design and build basis to provide 7no Vestas V80 turbines plus associated roads, d...
Rush Wall Wind Turbine
As specialists in the construction of onshore wind turbines, Green Cat Contracting were appointed to act as Principal Contractor and provide the ac...
Binn EcoPark Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E92 turbines at the Binn EcoPark near Glenfar...
Deuchries Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Enercon E82 turbines near Aberchirder, Aberdeenshire ...
Hoprigshiels Wind Cluster
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Nordex N90 turbines on a design and build basis, incl...
Welton of Creuchies
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E82 turbines on a design and build basis, inc...
Pogbie Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 12no Enercon E53 turbines on a design and build basis, in...