Deuchries Wind Farm

March 29, 2021

Project Name

Deuchries Wind Farm

Project Location

Aberchirder, Aberdeenshire

Client

Bradley Wind Limited

Client’s Project Manager

Green Cat Renewables

Turbines

3no Enercon E82

Height to tip 100m

Max Power Output 7MW

Key Info

  • Extensive cut/fill

  • On site borrowing to minimise imported aggregate

  • Off site cabling and connection works

Description

Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Enercon E82 turbines near Aberchirder, Aberdeenshire on a design and build basis, a project that had previously been deemed unviable by its’ former owner.

Due to the existing topography of the site, an extensive programme of earthworks was required. Due to the weak and variable nature of the existing soils however, two borrow pits were required to facilitate the works.

As well as the onsite electrical infrastructure and substation works, Green Cat Contracting facilitated over 1.5km of new cable installation offsite to connect the development to the existing DNO overhead line.