Binn EcoPark Wind Farm

March 29, 2021

Project Name

Binn EcoPark Wind Farm

Project Location

Glenfarg, Perth

Client

BF Energy Ltd & BF Energy CIC

Client’s Project Manager

Green Cat Renewables

Turbines

4no Enercon E92

Height to tip 115m

Max Power Output 10MW

Key Info

  • Over 4km of cable trenching

  • Constructed using site won and recycled materials

  • On site processing of recycled materials

Description

Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E92 turbines at the Binn EcoPark near Glenfarg, Perthshire.

As well as the over 1.2km of access track constructed from site won and recycled material from the Binn EcoPark, the works entailed upgrades to the existing and in use access roads that serve the wider Binn development. The construction of a new substation was required on site, plus external 33kV cable laying to provide a connection to existing local distribution network. In total over 4km of cabling and trenching works were required to complete the project.