Binn EcoPark Wind Farm


Project Name
Binn EcoPark Wind Farm
Project Location
Glenfarg, Perth
Client
BF Energy Ltd & BF Energy CIC
Client’s Project Manager
Green Cat Renewables
Turbines
4no Enercon E92
Height to tip 115m
Max Power Output 10MW
Key Info
-
Over 4km of cable trenching
-
Constructed using site won and recycled materials
-
On site processing of recycled materials
Description
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E92 turbines at the Binn EcoPark near Glenfarg, Perthshire.
As well as the over 1.2km of access track constructed from site won and recycled material from the Binn EcoPark, the works entailed upgrades to the existing and in use access roads that serve the wider Binn development. The construction of a new substation was required on site, plus external 33kV cable laying to provide a connection to existing local distribution network. In total over 4km of cabling and trenching works were required to complete the project.
More onshore wind projects
Hendy Wind Farm
Green Cat Contracting were employed as Principal Contractor on a design and build basis to provide 7no Vestas V80 turbines plus associated roads, d...
Rush Wall Wind Turbine
As specialists in the construction of onshore wind turbines, Green Cat Contracting were appointed to act as Principal Contractor and provide the ac...
Binn EcoPark Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E92 turbines at the Binn EcoPark near Glenfar...
Deuchries Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Enercon E82 turbines near Aberchirder, Aberdeenshire ...
Hoprigshiels Wind Cluster
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 3no Nordex N90 turbines on a design and build basis, incl...
Welton of Creuchies
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 4no Enercon E82 turbines on a design and build basis, inc...
Pogbie Wind Farm
Green Cat Contracting were appointed as Principal Contractor to deliver the BoP works for 12no Enercon E53 turbines on a design and build basis, in...